Ultilization Of The Floor Area |
|
• |
90% space shall be achieved with enough natural light. |
• |
Finishing touch of international standard on the floor. |
• |
Spacious and maintainable service area. |
• |
Easy use properties for desabled. |
• |
Well planned sanitary service. |
• |
Flexibility properties for various clientele. |
|
|
Block Structure |
|
Outer Area |
|
• |
Upper and lower Basement and ground floor parking. |
• |
Direct staff entrance at ground level from the area of the lobby and for visitors is at podium level. |
• |
Separate ramps office floor is on 4.00 meter height. |
• |
Flat slab structure to provide clear space at the ceiling level. |
|
|
Inner Area |
|
• |
Electrical room AHU room, Toilets & Staircases. |
• |
Fire Equipments on stairs. |
• |
Lift Elevators with powerful system to save time. |
|
|
Basement |
|
• |
Covered Parking area 2 levels 400+cars. |
• |
Uncovered Parking area 90+cars. |
|